So far the closet has been completely redone. We walled off in front of the chimney, and built the wall out about 2 1/2 feet, so we could each have our own side of the closet. It's much roomier this way. It's painted a chocolately brown (who says closets have to be blah white), with white trim. The finishing touch is a full length mirror, which is soon to come. After that we re-painted the ceiling, which is now bright crisp white. We had painted it with kilz when we bought the house 8 yrs ago, but 40 yrs of smoke is a lot to cover, so it was painted again.
Next up is to install the 1880's antique fireplace mantel on the newly expanded wall space between the bedroom and closet doors. Seavie is going to build a bump out all the way across, and above the mantel to make it look like a chimney. Which will then be most likely faux painted to look like brick. I love the stone and brick veneer but at $65-75 per 9 sq.ft in a box, is not worth it to me right now to put all the money into that detail right now. But maybe in the next few years. Then we'll tile the inside around the edges, and put pressed tin squares inside the opening to give it some more character. Also will be painting the air return vent bronze.
After that it will be layered crown molding, door and window trim, and base trim. My favorite part after that will be painting over this awful lavender color that I picked out 8 yrs ago. It's driving me nuts!
Furniture will be re-arranged and all switched up. I'm all about symmetry and things lining up and so it's going to be just perfect. My shabby chic chandelier with my funky white lamps, blue and chocolate brown damask comforter, stained glass, chocolately walls with blue curtains. In my mind it looks amazing. My goal is to hopefully get most of the room done by the end of March, but at least by the very first part of April, and then on to re-painting the living room and building a fireplace in there! I will try and post re-do pics along the way.
